From cut to finished goods,costed every stage.

Raise an order on its formula, then run it through cutting, stitching and finishing. See estimated and actual cost side by side at every stage.

Formula-driven6 stages3 routes / orderRework to any stage
ProductXpert
L
Oversized Tee
100% Cotton · Indigo
0104260009
0104 2600 09
Scan
The formula

Made to the gram, costed per size.

Each size has its own cost. Switch sizes and watch the total change.

Size
M
Cost per unit
235
× 600 pcs = 1,41,000
Cost split235
Bill of materials
Amount
Dealer B2B
392
Retail B2C
671
How to make it

Three ways to make it, chosen per order.

Each order takes its own route into the same stock.

In-house
01

Made end to end on your own floor.

Cutting
Stitching
Finishing
Quality check
Finished goods
Every stage tracked, worker by worker.
Job work
02

Outsourced to an external worker.

Issue materials out
Job worker
GRN return
Quality check
Finished goods
Reconciled via GRN. Ledger, invoice and payment per worker.
Purchase
03

Bought in as a finished product.

Raise PO
Supplier
Inward quality check
Finished goods
Same quality gate, then into stock.
The journey

One order, hung on the line from cut to stock.

Follow one order through every stage. Scroll to move it, or grab and pull.

01Stage

Cutting

Fabric leaves the store against the order, layered, marked, cut and bundled. Every metre on record from the first cut.

LayeringMarkerCuttingBundling
612
pcs cut
1,080 m issued · 36 m returned
02Stage

Pre-stitching

Optional, like pre finishing. Only the stages your product needs. Fusing, embroidery and printing before the machine line.

FusingEmbroideryPanel print
612
pcs in stage
All bundles scanned in
03Stage

Stitching

Bundles issued to workers, scanned back when done. Output tracked per worker, who did what, how much and when.

Shoulder joinSleevesSide seamHem
608
pcs stitched
4 pcs short · recorded with remarks
04Stage

Pre-finishing

Washing, pressing prep and thread trimming, whatever sits between the line and the finishing table.

WashThread trim
608
pcs in stage
Wash chemicals reconciled
05Stage

Finishing

Pressing, folding, tagging, packing. It starts looking like something a customer will hold.

PressingFoldingTaggingPacking
604
pcs finished
Tags · polybags issued
06Stage

Quality check

Every piece inspected before it can call itself a finished good. Pass, and it earns a product label. Fail, and

MeasurementStitch auditFinal visual
588 / 12
passed / flagged
Nothing quietly disappears
Stage

Rework

it goes back. To stitching, or all the way to cutting. The loop is tracked, nothing falls off the record.

12
pcs looped back
Re-inspected after repair
Stage

Finished goods

Repaired pieces rejoin the order. 600 garments enter stock with their full production history attached.

600
pcs in stock
Order PO-2481 complete
Labels and barcodes

Build the label by hand. Drag what prints.

Drag the fields you want onto the label.

Label builderdrag a chip onto the label →
Drag onto the label
ProductXpert
LSize
Oversized Tee
Indigo · combed cotton
MRP incl. taxes
₹ 899
SKUOT-IND-L
MfgJun 2026
BatchB-2409
Two types

Manufacturing tracks bundles on the floor. Product goes on finished goods.

Drag to build

Drop chips on the label. Drag them off to remove.

Logo · barcode · QR

Whatever your equipment reads.

Scan on the floor

Issue and return materials by scanning.

Raise the next order on a formula you trust.

See the formula, the routes, and the floor working together on your own products.